Journal Information
Journal ID (publisher-id): BM
Journal ID (nlm-ta): Biochem Med (Zagreb)
Title: Biochemia Medica
Abbreviated Title: Biochem. Med. (Zagreb)
ISSN (print): 1330-0962
ISSN (electronic): 1846-7482
Publisher: Croatian Society of Medical Biochemistry and Laboratory Medicine
Article Information
Copyright statement: ©Croatian Society of Medical Biochemistry and Laboratory Medicine.
Copyright: 2020, Croatian Society of Medical Biochemistry
License (open-access):
This is an Open Access article distributed under the terms of the Creative Commons Attribution (http://creativecommons.org/licenses/by/4.0/) which permits unrestricted non-commercial use, distribution, and reproduction in any medium, provided the original work is properly cited.
Date received: 15 October 2019
Date accepted: 31 December 2019
Publication date (print and electronic): 15 February 2020
Volume: 30
Issue: 1
Electronic Location Identifier: 010901
Publisher ID: bm-30-1-010901
DOI: 10.11613/BM.2020.010901
Six Sigma revisited: We need evidence to include a 1.5 SD shift in the extraanalytical phase of the total testing process
The Six Sigma methodology has been widely implemented in industry, healthcare, and laboratory medicine since the mid-1980s. The performance of a process is evaluated by the sigma metric (SM), and 6 sigma represents world class performance, which implies that only 3.4 or less defects (or errors) per million opportunities (DPMO) are expected to occur. However, statistically, 6 sigma corresponds to 0.002 DPMO rather than 3.4 DPMO. The reason for this difference is the introduction of a 1.5 standard deviation (SD) shift to account for the random variation of the process around its target. In contrast, a 1.5 SD shift should be taken into account for normally distributed data, such as the analytical phase of the total testing process; in practice, this shift has been included in all type of calculations related to SM including non-normally distributed data. This causes great deviation of the SM from the actual level. To ensure that the SM value accurately reflects process performance, we concluded that a 1.5 SD shift should be used where it is necessary and formally appropriate. Additionally, 1.5 SD shift should not be considered as a constant parameter automatically included in all calculations related to SM.
Keywords: extraanalytical phase; shift; Sigma metric; Six Sigma; total testing process